Poeira, concreto desgastado e um cronograma de produção que não pode parar por semanas. Endurecedores penetrantes e primers reconstruem a superfície sem parar a fábrica.

O que este piso precisa suportar

Entenda o modo de falha antes de escolher um sistema.

  1. 01

    Dusting concrete coats products, machinery and air filters — and it gets worse every year.

  2. 02

    The schedule cannot stop for weeks — the floor has to come back between shifts.

  3. 03

    Old coatings, oils and contamination decide what the new system can bond to.

  4. 04

    Budgets differ per zone — one factory rarely needs one solution everywhere.

Renovação de pisos & lajes antigas

Sistemas de revestimento recomendados

Selecionados por carga de trabalho — não existe sistema universal, existe o que se adapta.

01

Sealed & densified floor (no coating)

Esquema de camadas
Grind off the weak layer → densifier reacts inside the slab → progressive polish

For dusting, worn slabs that must return to service fast: nothing to peel, low cost per square metre, long service life.

Produtos deste sistema

Sequência padrão de aplicação

O mesmo piso com os mesmos materiais pode durar anos mais quando o serviço é executado com cuidado. Os seis passos abaixo são a nossa sequência padrão para pisos epóxi: o que cada etapa faz, segundo qual norma e o que verificamos na entrega. Para o seu galpão, ajustamos o número de camadas e a espessura às cargas reais, aos produtos químicos e à janela de parada.

  1. 01

    Substrate assessment

    Bond, contamination and moisture checks decide which renovation route is viable. The assessment decides between a resurfacing route and a full rebuild — pricing and schedule follow from it.

  2. 02

    Removal & repair

    Failed coatings and loose material ground off; cracks and holes repaired. After stripping, strength is re-tested; areas still short go deeper.

  3. 03

    Densifier route

    Penetration, reaction and progressive polishing bring the slab back harder than new. For dusting floors this route is preferred — no added film, the slab itself is hardened.

  4. 04

    Coating route

    Penetrating primer, build-up and a new topcoat matched to the zone duty. Renovation coatings lean on primer penetration; fast-absorbing areas take a double primer.

  5. 05

    Phased return to service

    Zones come back between shifts; production barely notices. Before each zone returns, a clean-down and protection briefing prevents cross-scratching.

Fotos de obra

Pisos prontos fotografados na obra — clique para ampliar e inspecionar os detalhes.

Densified old slab

A dusting floor brought back to a dense, polished surface.

Renovated working floor

New build-up over a sound slab — production never stopped.

Projetos representativos

Uma seleção de projetos entregues pelo grupo.

  • Automotive paint-shop renovation

    Renovating a live paint shop is a scheduling problem before it is a flooring one. For automotive clients including FAW, SAIC, Dongfeng, Beijing Benz, Geely, BYD, XPeng and NIO, we strip and re-lay floors zone by zone inside the owner's maintenance windows while the rest of the shop keeps producing.

  • Pharmaceutical workshop renewal without shutdown

    For clients such as Shineway Pharmaceutical, Huahai Pharmaceutical and Xinhua Pharmaceutical we have renewed workshop floors without stopping production: zoning, dust containment and low-odour solvent-free materials keep the clean areas clean while we work next door.

  • Residential garage refurbishment

    Older residential garages fail at the joints, the ramps and the oily bays first. On projects such as China Merchants' Cuican Mansion and the Xipai Jingyue development we renew traffic lanes and bays in phases, keeping half the garage usable throughout.

Perguntas frequentes

O que os compradores mais perguntam ao especificar um revestimento de piso.

Our floor is dusting badly. Densifier or coating?

If you need a hard, dust-free concrete surface and speed, densify. If you need colour, chemical resistance or washability, coat it — often both routes combine zone by zone.

Saiba mais
Can we avoid tearing out the old floor?

Usually yes. As long as the slab is structurally sound, the new system goes over it after grinding and repair — no demolition.

Saiba mais
How fast can we get back to work?

Densified areas come back within days; coated zones follow the curing plan. Everything is phased so shifts keep running.

Saiba mais
The old coating is still sticking in places — can it stay?

Possibly — adhesion testing decides. Sound, well-bonded areas can stay and be bridged; failing areas must go, or they will drag the new system down with them.

Saiba mais

Conte-nos sobre o seu piso

Envie o substrato, a área e o que o piso precisa suportar. Você receberá um sistema recomendado, um desenho do esquema de camadas e um orçamento — normalmente em um dia útil.

Solicitar orçamento